Vertical circulation core. Factory-built, with the lift inside.

The core, off the critical path
The vertical circulation core is where the most trades cross: structure, cladding, lift, electrics, crane. Twenty-three critical interfaces and, on average, five suppliers. When one runs late, they all do.
CorePod takes it off the site. It is built in parallel, in the factory, and arrives finished. Your programme is left with a single dependency: crane day.
What CorePod is
A factory-built vertical circulation core. The Core is the lift shaft: self-supporting structure, cladding and car, already installed and finished. The Pods are the modules that connect it to the building: walkways, landings, stairs and entrances.
What changes in the project
- 12 to 16 weeks of fabrication for standard orders, while the site moves ahead.
- One day to set it in place. Arrival, hoisting, placement and commissioning.
- One supplier. One contract, one warranty, fixed price and date.
- Less waste on site. 98% of the work happens in the factory.
How we work with your practice
- Design and fit, weeks 0 to 2. With your plan, we work out the fit and settle the model, cladding and Pods.
- Factory fabrication, weeks 2 to 12.
- Delivery and placement, one day.
- Certification and aftercare.
What we give you to design with
A dimensions catalogue with one sheet per model and its dimensioned plan. A technical dossier with structural calculations, loads on the building and details.
Lift and stairs
Today CorePod covers the lift and its entrances. The factory-built stair Pod, to complete the core, arrives in 2027.
Also: Modular lift Steel lift shaft structure Lift shaft dimensions Bolted structure or complete core A lift for a building that has none For lift companies